BUILDING OF SUBMARINES


LOK SABHA

The original proposal to build submarines based on the design of the German company, HDW, as modified to suit Indian Naval requirements but validated by a foreign vendor which had access to the original design data, was shelved mainly due to non-availability to the required weapon systems which was to be acquired from a French company. The French submarine meets the technical and operational requirements of the Indian Navy and has the advantage of fitment of the required weapon system. The choice of the French vendor was strictly on the basis of its assessed technical competence in transferring the build technology and the commercial offer that it has made. The French consortium, being a vendor to Pakistan also, is not a relevant factor.

This information was given by the Defence Minister Shri George Fernandes in a written reply to Shri Priya Ranjan Dasmunsi in Lok Sabha today.