RENOVATION OF INDRAPRASTHA POWER PLANT IN
DELHI
RAJYA SABHA
Indraprastha Power
Generation Company Ltd. (IPGCL) has planned to carry out the Renovation
& Modernization (R&M) work in all the four units of Indraprastha
Power Plant (3x62.5 MW + 1x60 MW). The job of comprehensive study
of R&M for the station has been entrusted to National Thermal
Power Corporation (NTPC). The cost of R&M as envisaged by
NTPC will be around Rs. 1.5 crore to Rs. 2.0 crore per MW for
which a provision has been made in the Plan funds of the IPGCL.
At present the station is operating at an average PLF of about
40% for the last 4 years. The maximum available out put of all
the four units is ranging from 45 MW to 50 MW. After R&M,
the station will operate at the installed nameplate capacity of
247.5 MW with life extension of 10-15 years. The work is expected
to be completed within 5 years.
This information
was given by Smt. Jayawanti Mehta, Minister of State for Power
in reply to a question by Shri B.J. Panda and Shri Kripal Parmar
in the Rajya Sabha today.